Some Basics You Should Know About Applying For Pueblo County Building Permits

djamal-soft الخميس، 24 يناير 2019
By Stephen Reed


The municipal building department within your area is responsible for enforcing the local building codes. The body, therefore, carries out the duty of issuing building permits before a property owner is allowed to erect a new structure or demolish, renovate or alter an existing one. By applying for Pueblo County building permits, the municipality is able to ensure that the best interests of property owners and the community as a whole are protected.

For any permit to be issued, your application must be reviewed by the municipality and the body will confirm that your undertakings adhere to the local codes. These codes mark the standards that have to be met in terms of building construction and design. Additionally, there are strict resource conservation, accessibility, fire protection, zoning bylaws, health and safety standards that each application must meet before approval.

There are a variety of developments that would require you to first get a permit. You need to obtain this very important document before putting a mobile structure or constructing one that is above ten square feet within your property. You also require a permit to excavate, construct seasonal buildings, repair, renovate, extend or change the current use of a specific building. It remains crucial to in addition make an application if you have work that involves repairing, extending, altering or installing of an on-site sewer system.

The process of applying for a permit is quite straightforward. The required application can be found on the website of the Ministry of Municipal Affairs. You can also source it from the municipal offices. While submitting the forms, also attach your building drawings and plans, among other documents associated with your developments.

If your work is seen to be in compliance with the local building codes and other laws that apply such as the local zoning bylaws, your applications will be sent to other municipal officials for further reviewing. Normally, it is easier and quicker to get a permit if you merely need to make minor additions or changes. It may take longer to get approval for an intricate proposal.

Within 10-30 days, you will either get your application approved or refused. Any concerns that may have led to the rejection of an application will come to your attention and once the indicated concerns are corrected, you can reapply. On the other hand, applications rejected because of technical requirements such as the local building codes or bylaws must first be forwarded to court for reviewing.

Once you are free to start constructions, you will need to schedule for mandatory inspections at predetermined stages of your project. The municipality will take between 2-5 working days to conduct the inspections. The work of an inspector is to affirm that your undertakings adhere to the building codes as well as with the terms of your permit and approved plans.

If you have never applied for a building permit in the past, the involved process may seem somewhat challenging. You can dodge all the hassles by applying with the help of a seasoned contractor. Such specialists are well acquainted with the requirements that must be met for any application to be approved.